239 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author김종수-
dc.date.accessioned2020-11-11T06:21:16Z-
dc.date.available2020-11-11T06:21:16Z-
dc.date.issued2002-05-
dc.identifier.citation한국산업경영시스템학회:학술대회논문집, page.203-208en_US
dc.identifier.urihttps://www.koreascience.or.kr/article/CFKO200230839598282.do-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/155404-
dc.description.abstractIn case of the problems with multiple plants, alternative operation sequence, alternative machine, setup time, and transportation time between plants, we need a robust methodology for the integration of process planning and scheduling in supply chain. The objective of this model is to minimize the tardiness and to maximize the resource utilization. So, we propose a multi-objective model with limited-capacity constraint. To solve this model, we develope an efficient and flexible model using adaptive genetic algorithm(AGA), compared to traditional genetic algorithm(TGA)en_US
dc.language.isoko_KRen_US
dc.publisher한국산업경영시스템학회en_US
dc.title다중플랜트 네트워크에서의 공급사슬계획en_US
dc.title.alternativeSupply chain planning in a multi-plant chainen_US
dc.typeArticleen_US
dc.contributor.googleauthor정재혁-
dc.contributor.googleauthor문치웅-
dc.contributor.googleauthor김종수-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING-
dc.identifier.pidpure-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE