Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
- Title
- Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
- Author
- 김종수
- Keywords
- Production management (Manufacturing); Production scheduling; Industrial management; Production planning
- Issue Date
- 2004-08
- Publisher
- TAYLOR & FRANCIS LTD
- Citation
- International Journal of Production Research, v. 42, No. 15, Page. 2941-2955
- Abstract
- The e-plant chain is an extension of the integration beyond a production site by means of improved distribution management, electronic data interchange and coordination of multiple plants. The present paper proposes an advanced planning and scheduling model for the e-plant chain. The advanced planning and scheduling is the most important function when supporting flexible planning and scheduling in the e-plant chain. The problem is formulated as a mixed integer-programming model. The model includes the main features of the system including flexible operations' sequences, resource requirements and alternative schedules. Since the problem is NP-hard, an intelligent search approach based on a genetic algorithm is developed. Numerical experiments show the proposed approach is satisfactory in its accuracy and efficiency.
- URI
- https://information.hanyang.ac.kr/#/eds/detail?an=14077795&dbId=bthhttps://repository.hanyang.ac.kr/handle/20.500.11754/151666
- ISSN
- 0020-7543
- DOI
- 10.1080/00207540410001691956
- Appears in Collections:
- COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
- Files in This Item:
There are no files associated with this item.
- Export
- RIS (EndNote)
- XLS (Excel)
- XML