Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sarkar, Biswajit | - |
dc.date.accessioned | 2020-01-07T05:40:24Z | - |
dc.date.available | 2020-01-07T05:40:24Z | - |
dc.date.issued | 2017-04 | - |
dc.identifier.citation | JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, v. 13, No. 2, Page. 1085-1104 | en_US |
dc.identifier.issn | 1547-5816 | - |
dc.identifier.issn | 1553-166X | - |
dc.identifier.uri | https://www.aimsciences.org/journals/displayArticles.jsp?paperID=13104 | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/121609 | - |
dc.description.abstract | For quality improvement purposes often times, a manufacturing unit has to change certain parts of equipment. Any such changes in the assembly line manufacturing system or production process involves a cost known as the setup cost. Minimizing the setup cost and improving the product quality is of prime importance in today's competitive business arena. This paper develops the effects of setup cost reduction and quality improvement in a two-echelon supply chain model with deterioration. The objective is to minimize the total cost of the entire supply chain model (SCM) by simultaneously optimizing setup cost, process quality, number of deliveries, and lot size. Numerical examples are provided to illustrate the model. | en_US |
dc.description.sponsorship | This work was support by the research fund of Hanyang University (HY-2016-P) (Project Number 201600000000282). | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | AMER INST MATHEMATICAL SCIENCES-AIMS | en_US |
dc.subject | Supply chain management | en_US |
dc.subject | manufacturing quality improvement | en_US |
dc.subject | manufacturing setup cost reduction | en_US |
dc.subject | deterioration | en_US |
dc.subject | SSMD policy | en_US |
dc.title | Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.3934/jimo.2016063 | - |
dc.relation.page | 1085-1104 | - |
dc.relation.journal | JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION | - |
dc.contributor.googleauthor | Sarkar, Biswajit | - |
dc.contributor.googleauthor | Majumder, Arunava | - |
dc.contributor.googleauthor | Sarkar, Mitali | - |
dc.contributor.googleauthor | Dey, Bikash Koli | - |
dc.contributor.googleauthor | Roy, Gargi | - |
dc.relation.code | 2017005556 | - |
dc.sector.campus | E | - |
dc.sector.daehak | COLLEGE OF ENGINEERING SCIENCES[E] | - |
dc.sector.department | DEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING | - |
dc.identifier.pid | bsarkar | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.