296 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author양내원-
dc.date.accessioned2019-09-09T01:28:40Z-
dc.date.available2019-09-09T01:28:40Z-
dc.date.issued2005-04-
dc.identifier.citation의료·복지 건축, v. 11, No. 1, Page. 33-41en_US
dc.identifier.issn1975-3349-
dc.identifier.urihttp://kiss.kstudy.com/thesis/thesis-view.asp?key=2425009-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/110369-
dc.description.abstractThe construction can proceed in different ways according to the acquired profitability of the hospital during the construction and to the features of departments or areas. This study is an analysis of remodeling construction processes to resolve major tasks of remodeling. The remodeling strategies gained from this study can be summed up as follows: 1) Remodeling work in hospitals involves the acquire relocation of space through extensive area renovations and then moving back to the space, and lastly working on the empty space. Thus, it is more advantageous in terms of construction work to demolish the existing buildings than to acquire the relocation space through extensions or renovations. That is, demolition after the maximum utilization of the existing buildings is the most desirable in terms of space availability.2) The construction methods for remodeling are two: a method of carrying out construction by dividing the plane areas into several individual ones and of working on it floor by floor. In case of ward areas, and the outpatient area, the construction proceeds after securing the relocation space and partially setting construction areas in order to minimize the decrease in profitability due to the smaller number of beds and treatment rooms during construction. If the outpatient diagnosis/ treatment area and the supply area relocate together with the ward areas, there may be extra expenses. Thus, doing construction by area, while partially operating those areas or after relocating the whole areas.en_US
dc.language.isoko_KRen_US
dc.publisher한국의료복지건축학회en_US
dc.subject종합병원en_US
dc.subject리모델링en_US
dc.subject공사계획en_US
dc.subjectGeneral hospitalen_US
dc.subjectRemodelingen_US
dc.subjectConstruction planen_US
dc.title국내 종합병원의 리모델링의 리모델링 공사수행 전략에 관한 연구en_US
dc.title.alternativeA Study on the Remodeling Construction Execution Strategy of General Hospitals in Koreaen_US
dc.typeArticleen_US
dc.relation.journal한국의료복지시설학회지-
dc.contributor.googleauthor김하진-
dc.contributor.googleauthor양내원-
dc.relation.code2012211775-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDIVISION OF ARCHITECTURE-
dc.identifier.pidnwyang-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > ARCHITECTURE(건축학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE