Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 안선응 | - |
dc.date.accessioned | 2019-08-16T02:12:51Z | - |
dc.date.available | 2019-08-16T02:12:51Z | - |
dc.date.issued | 2006-10 | - |
dc.identifier.citation | 한국산업경영시스템학회 2006년 추계학술대회 논문집, Page. 238~241 | en_US |
dc.identifier.uri | http://scholar.dkyobobook.co.kr/searchDetail.laf?barcode=4010020290226 | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/108676 | - |
dc.description.abstract | For leased equipments the lessor incurs penalty costs for failures occurring over the lease period and for not rectifying such failures within a specified time limit. Preventive maintenance action may reduce failures but increase preventive maintenance costs. This paper determines a periodic preventive maintenance policy for minimizing costs when repair time is proportional to the failure intensity function. | en_US |
dc.language.iso | ko_KR | en_US |
dc.publisher | 한국산업경영시스템학회 | en_US |
dc.subject | preventive maintenance | en_US |
dc.subject | repair time | en_US |
dc.subject | penalty costs | en_US |
dc.subject | leased contact | en_US |
dc.title | 대여 장비에 대한 예방 유지보수 정책의 최적안 결정 | en_US |
dc.type | Article | en_US |
dc.contributor.googleauthor | 안선응 | - |
dc.contributor.googleauthor | 최현민 | - |
dc.sector.campus | E | - |
dc.sector.daehak | COLLEGE OF ENGINEERING SCIENCES[E] | - |
dc.sector.department | DEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING | - |
dc.identifier.pid | sunahn | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.