2019-09 | Preliminary Evacuation Time Estimate in Korea and Its Application into Level 3 PSA | 제무성 |
2021-02 | A preliminary site risk assessment | 제무성 |
2019-05 | A Preliminary Site Risk Assessment for Multi-unit Nuclear Power Plants | 제무성 |
2019-10 | A Preliminary Site Risk Assessment for the Reference Site in Korea | 제무성 |
2017-03 | A Probabilistic Consequence Assessment for a Very High Temperature Reactor | 제무성 |
2015-10 | A Probabilistic Methodology for Assessing the Effectiveness of the Containment Filtered Venting Systems | 제무성 |
2015-10 | A Qualitative Accident Scenario Analysis for a Very High Temperature Reactor | 제무성 |
2016-05 | A Quantitative Accident Sequence Analysis for a VHTR | 제무성 |
2018-01 | Quantitative assessment of severe accident management strategies in a nuclear power plant | 제무성 |
2014-10 | A Reliability Assessment Methodology for the VHTR Passive Safety System | 제무성 |
2016-10 | A Sensitivity Analysis of Modified Input Parameters of GASDOS for a Representative Person Concept | 제무성 |
2015-03 | A Severe Accident Analysis for the System-Integrated Modular Advanced Reactor | 제무성 |
2020-07 | Severe Accident Analysis in Mid Loop Operation at OPR1000 Using MELCOR | 제무성 |
2020-05 | A source term binning methodology for multi-unit consequence analyses | 제무성 |
2016-10 | A Study on Accident Sequence Analysis for a Heavy Ion Accelerator, RAON | 제무성 |
2012-01 | A STUDY ON METHODOLOGY FOR IDENTIFYING CORRELATIONS BETWEEN LERF AND EARLY FATALITY | 제무성 |
2018-06 | A study on reliability assessment of a decay heat removal system for a sodium-cooled fast reactor | 제무성 |
2016-10 | A Study on the Off-site Consequence Analysis for a VHTR | 제무성 |
2019-10 | An Uncertainty Analysis of Radioactive Material Release for L3 PSA | 제무성 |
2016-07 | Use of Decision Trees for Evaluating Severe Accident Management Strategies in Nuclear Power Plants | 제무성 |