2011-01 | Labour productivity model for reinforced concrete construction projects | 김주형 |
2016-04 | LCCA 및 LCA 분석을 이용한 오피스 빌딩에 지능형 대기전력제어시스템 도입의 타당성 분석에 관한 연구 | 김주형 |
2022-07 | The Need for Smart Architecture Caused by the Impact of COVID-19 upon Architecture and City: A Systematic Literature Review | 김주형 |
2021-01 | Networking human biomarker and hazardous chemical elements from building materials: Systematic literature review and in vivo test | 김주형 |
2021-04 | Networking human biomarker and hazardous chemical elements from building materials: Systematic literature review and in vivo test | 김주형 |
2008-02 | Nonvolatile memory characteristics in metal-oxide-semiconductor containing quantum dots fabricated by unique laser irradiation method | 김주형 |
2020-05 | Optimal BIM staffing in construction projects using a queueing model | 김주형 |
2020-05 | Public rental housing ownership conversion based on housing affordability in China | 김주형 |
2022-04 | Qualitative Assessment of Collaborative Behavior Based on Self-Perception Personality Tests for BIM Staff | 김주형 |
2017-12 | Reciprocal Relations between Official Development Assistance Recipient and Donor Countries: Case of South Korean Overseas Construction Business and Southeast Asian Countries' Economy | 김주형 |
2017-01 | Soil Recycling Among Construction Sites by Optimizing Schedule and Costs for Earthmoving | 김주형 |
2011-06 | Strategies for Developing Countries to Expand Their Shares in the Global Construction Market: Phase-Based SWOT and AAA Analyses of Korea | 김주형 |
2016-04 | Structural Changes in the Korean Housing Market before and after Macroeconomic Fluctuations | 김주형 |
2011-07 | A STUDY ON CLASSIFICATION OF FACILITY ELEMENTS FOR SUPPORTING PROJECT DEFINITION OF URBAN RENEWAL MEGA PROJECT USING MORPHOLOGICAL BOX METHOD | 김주형 |
2011-07 | A STUDY ON DATA INTERACTION AMONG DIFFERENT LEVELS OF DETAIL IN PLANNING PHASES FOR MEGA PROJECTS | 김주형 |
2018-10 | A study on probabilistic social cost-benefit analysis to introduce high-efficiency motors into subway station ventilation | 김주형 |
2011-02 | A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA | 김주형 |
2011-07 | STUDY ON THE MAJOR DELAY FACTORS IN FINISHING WORKS BEFORE COMPLETION OF CONSTRUCTION | 김주형 |
2011-07 | A STUDY ON THE USE OF WEATHER INFORMATION IN CONSTRUCTION SCHEDULE MANAGEMENT | 김주형 |
2011-01 | TACT 공정기법의 작업 유형 분류를 통한 진도관리 개선 방안에 관한 연구 | 김주형 |