Browsing "INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과)" byAuthor허선

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 1 to 20 of 129

Issue DateTitleAuthor(s)
2019-12A Graphical Model to Diagnose Product Defects with Partially Shuffled Equipment Data허선
2021-04A Membership Probability–Based Undersampling Algorithm for Imbalanced Data허선
2016-12A MODEL FOR DETERMINING OPTIMAL BATCH SIZES OF MULTI-FEATURED PRODUCTS WITH RANDOM PROCESSING ACCURACIES UNDER QUALITY AND COST CONSTRAINTS허선
2005-12A multiechelon repairable item inventory system with lateral transshipment and a general repair time distribution허선
2021-07A Time-Series Data Generation Method to Predict Remaining Useful Life허선
2018-11A3C 깊은 강화학습을 이용한 다수의 의존적 창고 재고관리 스케줄링허선
2007-05An Algorithm for Repairable Item Inventory System with Depot Spares and General Repair Time Distribution허선
2002-10An analysis of AS/RS performing both single and dual commands허선
2003-08An analysis of the M/G/1 system with N and T policy허선
2006-10AN ANALYSIS OF THE PERFORMANCE OF BINARY EXPONENTIAL BACKOFF ALGORITHM IN A RANDOM ACCESS PACKETS NETWORKS허선
2005-05An Analytic Model for Correlated Traffics in Computer-Communication Networks허선
2002-12Asymptotic properties of a particular nonlinear regression quantile estimation허선
2002-10ATM traffic modelling by Markov renewal processes허선
2005-12Batch arrival queues with vacations and server setup허선
2018-08Bayesian Network Model to Diagnose WMSDs with Working Characteristics허선
2020-04Bayesian network model to diagnose WMSDs with working characteristics허선
2015-04C-CRF를 이용한 복합화력발전소의 발전량 예측허선
2020-01Clustering and Dispatching Rule Selection Framework for Batch Scheduling허선
2016-06Continuous Conditional Random Field Model for Predicting Electrical Power Output of a Combined Cycle Power Plant허선
2016-06Continuous Conditional Random Field Model for Predicting the Electrical Load of a Combined Cycle Power Plant허선

BROWSE