Browsing "ARCHITECTURE(건축학부)" byAuthor안용한

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 1 to 30 of 114

Issue DateTitleAuthor(s)
2021-063D맵핑을 활용한 노후 공동주택 안전점검의 기초연구안용한
2018-07Advanced Wireless Sensor Networks for Sustainable Buildings Using Building Ducts안용한
2020-11AECO(Architect, Engineering, Construction and Operation) 업계에서의 BIM 아웃소싱 현황 분석에 관한 기초 연구안용한
2021-06Analysis of embodied carbon emissions for a relocatable modular steel building in south korea안용한
2016-03An analysis of energy consumption to identify urban energy poverty in Seoul안용한
2018-10Analyzing the FinishingWorks Service Life Pattern of public housing in South Korea by Probabilistic Approach안용한
2018-10Analyzing the Long-Term Service Life of MEP Using the Probabilistic Approach in Residential Buildings안용한
2019-06Assessments of Intuition and Efficiency: Remote Control of the End Point of Excavator in Operational Space by Using One Wrist안용한
2020-12Automatic Concrete Damage Recognition Using Multi-Level Attention Convolutional Neural Network안용한
2019-05BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea안용한
2021-06BIM을 활용한 건축물 손상부위 표현을 위한 디지털 트윈 기초연구안용한
2019-05Business Models and Performance of International Construction Companies안용한
2020-03Classifying the Business Model Types of International Construction Contractors안용한
2021-07Comparison of Building Simulation Methods for Modeling Apartment Balconies안용한
2020-01A Comprehensive Analysis: Sustainable Trends and Awarded LEED 2009 Credits in Vietnam안용한
2021-04A Comprehensive Review of The Construction Materials Databases Contributed to The Sustainable Building안용한
2019-10Configuration Optimization for End-Point Stabilization of Redundant Manipulators With Base Flexibility안용한
2017-02Construction management risk system (CMRS) for construction management (CM) firms안용한
2017-12Construction process framework for a green building projects안용한
2020-04Creation of One Excavator as an Obstacle in C-Space for Collision Avoidance during Remote Control of the Two Excavators Using Pose Sensors안용한
2021-04DBB 방식에서 설계자와 계약자의 BIM 기반 협업의 현재 문제점 파악에 관한 연구안용한
2021-05Developing a machine learning-based building repair time estimation model considering weight assigning methods안용한
2021-11Developing a Risk Management Process for General Contractors in the Bidding Stage for Design-Build Projects in Vietnam안용한
2020-12Developing risk breakdown structure for nuclear power plant decommissioning projects in Korea focusing on radioactive concrete dismantle안용한
2016-02Development of a green road rating system for South Korea안용한
2019-04Development of an Energy Saving Strategy Model for Retrofitting Existing Buildings: A Korean Case Study안용한
2016-04The development of an energy-efficient remodeling framework in South Korea안용한
2018-06Development of Improved Frequency Expressions for Composite Horizontally Curved Bridges with High-Performance Steel Girders안용한
2016-04Effect of Chlorides on Conductivity and Dielectric Constant in Hardened Cement Mortar: NDT for Durability Evaluation안용한
2021-08Effect of Waste Ceramic Powder on Properties of Alkali-Activated Blast Furnace Slag Paste and Mortar안용한

BROWSE