Hanyang University repository
menu
검색
Library
Hanyang
Browse
Communities & Collections
Titles
Authors
My Repository
My Account
Receive email updates
Edit Profile
Repository at Hanyang University
Search
All of Repository
COLLEGE OF ENGINEERING[S](공과대학)
INDUSTRIAL ENGINEERING(산업공학과)
Articles
Theses (Master)
Theses (Ph.D.)
Start a new search
Current filters:
Title
Author
Subject
Date Issued
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Add filters:
Title
Author
Subject
Date Issued
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Sort items by
Relevance
Title
Issue Date
In order
Ascending
Descending
Authors/record
All
1
5
10
15
20
25
30
35
40
45
50
Results 1-9 of 9 (Search time: 0.001 seconds).
Item hits:
Issue Date
Title
Author(s)
2017-06
Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops
이동호
2018-12
COMMON DUE-DATE ASSIGNMENT AND SCHEDULING ON A SINGLE MACHINE WITH SEQUENCE-DEPENDENT SETUPS AND DISCRETELY CONTROLLABLE PROCESSING TIMES
이동호
2018-02
Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
이동호
2011-12
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
이동호
2011-11
Solution algorithms for dynamic lot-sizing in remanufacturing systems
이동호
2015-03
Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines
이동호
2015-09
Capacity and production planning for a hybrid system with manufacturing and remanufacturing facilities
이동호
2014-12
AN OPERATION-LEVEL DYNAMIC CAPACITY SCALABILITY MODEL FOR RECONFIGURABLE MANUFACTURING SYSTEMS
이동호
2021-03
Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times
이동호
previous
1
next
Discover
-Author
9
이동호
-Subject
2
controllable processing times
2
scheduling
1
batching
1
branch and bound
1
capacity and production planning
1
capacity scalability
1
case study
1
closed queuing network
1
common due-date assignment and sc...
1
disassembly level and sequence
next >
-Date issued
1
2021
2
2018
1
2017
2
2015
1
2014
2
2011
BROWSE
Communities & Collections
Titles
Authors