Browsing "INDUSTRIAL ENGINEERING(산업공학과)" byTitle

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 21 to 40 of 268

Issue DateTitleAuthor(s)
2016-06A Branch and Bound Algorithm for Parallel and Selective Disassembly Sequencing with Sequence-Dependent Setups이동호
2015-09Capacity and production planning for a hybrid system with manufacturing and remanufacturing facilities이동호
2015-02A case study on collection network design, capacity planning and vehicle routing in reverse logistics이동호
2014-04A Case Study on Decision Tree based Real-time Scheduling for Flexible Job Shops with Reconfigurable Machining Cells이동호
2011-07A case study on period vehicle routing in a refuse collection system이동호
2012-03A centralized/decentralized design of a full return contract for a risk-free manufacturer and a risk-neutral retailer under partial information sharing정인재
2013-02Change-point detection in failure intensity: A case study with repairable artillery systems배석주
2016-02Characterizing exons and introns by regularity of nucleotide strings이기천
2018-06Classification of acoustic noise signals using wavelet spectrum based support vector machine배석주
2014-03A closed-loop supply chain for deteriorating products under stochastic container return times김태복
2019-08Cluster analysis on the structure of the cryptocurrency market via Bitcoin-Ethereum filtering송재욱
2019-11Collaborative last-mile delivery and pick-up in city logistics김태복
2019-08Collection network design with capacity planning in reverse logistics: static and restricted-dynamic models이동호
2018-12COMMON DUE-DATE ASSIGNMENT AND SCHEDULING ON A SINGLE MACHINE WITH SEQUENCE-DEPENDENT SETUPS AND DISCRETELY CONTROLLABLE PROCESSING TIMES이동호
2013-05Common due-date assignment and scheduling on parallel machines with sequence-dependent setup times이동호
2012-05Common due-date assignment and scheduling with sequence-dependent setup times: a case study on a paper remanufacturing system이동호
2012-05Composite sourcing policy considering raw-material consumption김태복
2019-04Condition monitoring of a steam turbine generator using wavelet spectrum based control chart배석주
2020-09Condition monitoring scheme via one-class support vector machine and multivariate control charts배석주
2017-12CONSTRAINED RANKING AND SELECTION FOR OPERATIONS OF AN EMERGENCY DEPARTMENT박철진

BROWSE