Browsing "INDUSTRIAL ENGINEERING(산업공학과)" byAuthor이동호

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 1 to 30 of 62

Issue DateTitleAuthor(s)
2020-02Batching and scheduling for a single-machine flexible machining cell with multi-fixturing pallets and controllable processing times이동호
2018-02Bi-Criterion Scheduling for a Flexible Machining Cell with Multi-fixturing Pallets and Controllable Processing Times이동호
2016-06A Branch and Bound Algorithm for Parallel and Selective Disassembly Sequencing with Sequence-Dependent Setups이동호
2015-09Capacity and production planning for a hybrid system with manufacturing and remanufacturing facilities이동호
2015-02A case study on collection network design, capacity planning and vehicle routing in reverse logistics이동호
2014-04A Case Study on Decision Tree based Real-time Scheduling for Flexible Job Shops with Reconfigurable Machining Cells이동호
2011-07A case study on period vehicle routing in a refuse collection system이동호
2019-08Collection network design with capacity planning in reverse logistics: static and restricted-dynamic models이동호
2018-12COMMON DUE-DATE ASSIGNMENT AND SCHEDULING ON A SINGLE MACHINE WITH SEQUENCE-DEPENDENT SETUPS AND DISCRETELY CONTROLLABLE PROCESSING TIMES이동호
2013-05Common due-date assignment and scheduling on parallel machines with sequence-dependent setup times이동호
2012-05Common due-date assignment and scheduling with sequence-dependent setup times: a case study on a paper remanufacturing system이동호
2013-11Designing Refuse Collection Networks under Capacity and Maximum Allowable Distance Constraints이동호
2016-02Disassembly leveling and lot sizing for multiple product types: a basic model and its extension이동호
2011-12Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal이동호
2012-11A Dynamic Collection Network Design and Capacity Planning Model in Reverse Logistics이동호
2021-03Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times이동호
2012-10Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines이동호
2013-08Heterogeneous fixed fleet vehicle routing considering carbon emission이동호
2012-10Heuristic algorithms for minimising total recovery cost of end-of-life products under quality constraints이동호
2020-12A Heuristic for Service-Parts Lot-Sizing with Disassembly Option이동호
2013-07Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures이동호
2015-01An integrated approach for collection network design, capacity planning and vehicle routing in reverse logistics이동호
2012-05An Integrated Model for Collection Network Design and Capacity Planning in Reverse Logistics이동호
2017-10Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups이동호
2017-06Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops이동호
2012-12Iterative algorithms for part grouping and loading in cellular reconfigurable manufacturing systems이동호
2012-01Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints이동호
2019-03Loading and scheduling for flexible manufacturing systems with controllable processing times이동호
2012-02Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling이동호
2018-03Mathematical model and solution algorithms for capacitated dynamic lot-sizing in remanufacturing systems이동호

BROWSE