Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김주형 | - |
dc.date.accessioned | 2018-02-14T08:38:37Z | - |
dc.date.available | 2018-02-14T08:38:37Z | - |
dc.date.issued | 2012-04 | - |
dc.identifier.citation | Journal of the Korea Institute of Building Construction, 12, 3, 12, 299-314 | en_US |
dc.identifier.issn | 1598-2033 | - |
dc.identifier.uri | http://koreascience.or.kr/article/ArticleFullRecord.jsp?cn=GCSGBX_2012_v12n3_299 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.11754/37599 | - |
dc.description.abstract | One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means ofa 3D product model. In the conventional construction project process, clashes have been found during constructionphase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at designphase, relevant business process and guide for this task should be provided. This study aims to identify hindrances inclash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenienceof IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasksaccording to business process. For this reason, in this research, Business Process Model and Notation (BPMN) isintroduced to provide ideal process and required decision making governance. The provide BPMN model will provideinsights for a BIM-based collaborative environment to enhance the constructability through the construction project. | en_US |
dc.language.iso | en | en_US |
dc.publisher | The Korean Institute of Building Construction | en_US |
dc.subject | building information modeling | en_US |
dc.subject | clash detection | en_US |
dc.subject | collaborative process | en_US |
dc.title | Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability | en_US |
dc.type | Article | en_US |
dc.relation.no | 3 | - |
dc.relation.volume | 12 | - |
dc.identifier.doi | 10.5345/JKIBC.2012.12.3.299 | - |
dc.relation.page | 299-314 | - |
dc.relation.journal | 한국건축시공학회지 | - |
dc.contributor.googleauthor | Seo, Jung-Ho | - |
dc.contributor.googleauthor | Lee, Baek-Rae | - |
dc.contributor.googleauthor | Kim, Ju-Hyung | - |
dc.contributor.googleauthor | Kim, Jae-Jun | - |
dc.relation.code | 2012233427 | - |
dc.sector.campus | S | - |
dc.sector.daehak | COLLEGE OF ENGINEERING[S] | - |
dc.sector.department | DEPARTMENT OF ARCHITECTURAL ENGINEERING | - |
dc.identifier.pid | kcr97jhk | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.