Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 태성호 | - |
dc.date.accessioned | 2023-05-19T04:07:20Z | - |
dc.date.available | 2023-05-19T04:07:20Z | - |
dc.date.issued | 2012-05 | - |
dc.identifier.citation | 한국건축시공학회 2012년 춘계학술발표대회 논문집, v. 12, NO. 1, Page. 53-54 | - |
dc.identifier.uri | https://kiss.kstudy.com/thesis/thesis-view.asp?key=3448478 | en_US |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/180816 | - |
dc.description.abstract | This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed. | - |
dc.description.sponsorship | 이 논문은 2012년도 정부(교육과학기술부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(No. 20120000723, No.20110028794) | - |
dc.language | ko | - |
dc.publisher | 한국건축시공학회 | - |
dc.subject | LOD | - |
dc.subject | Life Cycle Assessment | - |
dc.subject | BIM | - |
dc.subject | Level of Detail | - |
dc.subject | 전과정 평가 | - |
dc.subject | CO2 | - |
dc.title | 건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구 | - |
dc.title.alternative | A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD | - |
dc.type | Article | - |
dc.relation.no | 1 | - |
dc.relation.volume | 12 | - |
dc.relation.page | 53-54 | - |
dc.relation.journal | 한국건축시공학회 2012년 춘계학술발표대회 논문집 | - |
dc.contributor.googleauthor | 방준식 | - |
dc.contributor.googleauthor | 태성호 | - |
dc.contributor.googleauthor | 노승준 | - |
dc.contributor.googleauthor | 금원석 | - |
dc.sector.campus | E | - |
dc.sector.daehak | 공학대학 | - |
dc.sector.department | 건축공학전공 | - |
dc.identifier.pid | jnb55 | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.