공정-공사비 통합관리를 위한 현장공사관리체계 개선방안 - 정보모델링 방법론을 중심으로 -
- Title
- 공정-공사비 통합관리를 위한 현장공사관리체계 개선방안 - 정보모델링 방법론을 중심으로 -
- Author
- 김경래
- Keywords
- 공정; 공사비; 단위작업; 공정-공사비 총합관리; 데이터베이스
- Issue Date
- 2001-12
- Publisher
- ARCHITECTURAL INSTITUTE OF KOREA
- Citation
- JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Structure & Construction, v. 17, no. 6, page. 113-122
- Abstract
- Construction management in fields mainly deals with both schedule itself and construction cost, which are to be correlated and integrated. However, in its own practice they are executed respectively. When it comes to both schedule and cost, there must be a synergy effect if they are webbased by integrated management whose tasks are composed of data sharing and periodical updating. Therefore, in order to manage both of them, first thing to do is to set up an integrated field management system, which enables project management staff to monitor baseline versus actual data. Secondly, it should be timely provided accumulated database as a standard management module.
This study based on an analysis from present construction management processes and their needs. The study provides a model of integrated schedule and cost management process and database using information modeling method.
- URI
- https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE00365456?https://repository.hanyang.ac.kr/handle/20.500.11754/160426
- ISSN
- 1226-9107; 2384-1788
- Appears in Collections:
- ETC[S] > 연구정보
- Files in This Item:
There are no files associated with this item.
- Export
- RIS (EndNote)
- XLS (Excel)
- XML