309 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이동호-
dc.date.accessioned2019-12-07T20:37:56Z-
dc.date.available2019-12-07T20:37:56Z-
dc.date.issued2018-04-
dc.identifier.citationPROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, v. 232, no. 5, page. 867-878en_US
dc.identifier.issn0954-4054-
dc.identifier.issn2041-2975-
dc.identifier.urihttps://journals.sagepub.com/doi/abs/10.1177/0954405416661001?journalCode=pibb-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/118434-
dc.description.abstractDisassembly levelling is to determine disassembly structures that specify components to be obtained from end-of-use/life products, and disassembly lot-sizing is to determine the timing and quantity of disassembling end-of-use/life products to satisfy the demands of their components. As an extension of the previous studies that consider them separately, this study integrates the two problems, especially in the form of multi-period model. Particularly, this study considers a generalized integrated problem in which disassembly levels may be different for the products of the same type. To describe the problem mathematically, we develop an integer programming model that minimizes the sum of setup, operation and inventory holding costs. Then, due to the problem complexity, a heuristic algorithm is proposed that consists of two phases: (a) constructing an initial solution using a priority-based greedy heuristic and (b) improving it by removing unnecessary disassembly operations after characterizing the properties of the problem. To show the performance of the heuristic algorithm, computational experiments were performed on various test instances and the results are reported.en_US
dc.description.sponsorshipThe author(s) disclosed receipt of the following financial support for the research, authorship, and/or publication of this article: This work was supported by the National Research Foundation of Korea grant funded by Korea government (NRF) (Grant Code: 2011-0015888). This is gratefully acknowledged.en_US
dc.language.isoen_USen_US
dc.publisherSAGE PUBLICATIONS LTDen_US
dc.subjectDisassembly levellingen_US
dc.subjectdisassembly lot-sizingen_US
dc.subjectmulti-period modelen_US
dc.subjectinteger programmingen_US
dc.subjectheuristicen_US
dc.titleMulti-period disassembly levelling and lot-sizing for multiple product types with parts commonalityen_US
dc.typeArticleen_US
dc.relation.no5-
dc.relation.volume232-
dc.identifier.doi10.1177/0954405416661001-
dc.relation.page867-878-
dc.relation.journalPROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE-
dc.contributor.googleauthorKim, Dong-Hyun-
dc.contributor.googleauthorDoh, Hyoung-Ho-
dc.contributor.googleauthorLee, Dong-Ho-
dc.relation.code2018003026-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL ENGINEERING-
dc.identifier.pidleman-
dc.identifier.orcidP-2938-2018-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > INDUSTRIAL ENGINEERING(산업공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE