After the incendiary fire accident at Daegu subway, discussion of PSD installation started to prevent accident from fall? safety accident and big accident. Following these paradigm, the purpose of the study is to analyze the present condition of current installation of PSD in our country and suggest an improvement scheme for the future PSD operation extension. Using the SWOT analysis and we analyze the inner and outer capability of PSD installation. We try to find a counter plan strategy for PSD installation improvement scheme through the analysis.