퍼지기법을 활용한 임대형 민자사업(BTL)의 사업단계별 리스크 인자 영향도 분석에 관한 연구 - 교육시설을 중심으로
- Title
- 퍼지기법을 활용한 임대형 민자사업(BTL)의 사업단계별 리스크 인자 영향도 분석에 관한 연구 - 교육시설을 중심으로
- Other Titles
- Analyzing Effects of Risk Factors Generated During the Whole Phases of Build Transfer Lease Projects Utilizing Fuzzy Techniques - Focusing on Educational Facilities -
- Author
- 이윤선
- Keywords
- 민간투자사업; 리스크 인자; 퍼지기법; 퍼지추론; 다기준 결정분석방법론; 중요도; 위험도; BTL; Risk Factors; Fuzzy Techniques; Fuzzy Inference; AHP; Value of Importance; Value of Risk
- Issue Date
- 2008-02
- Publisher
- 대한건축학회
- Citation
- 대한건축학회논문집 - 구조계, v. 24, No. 2, Page. 103-112
- Abstract
- This study suggests analyzing effects of risk factors generated during the whole phases of BTL projects focusing on educational facilities through utilizing fuzzy techniques. Risks factors have been generally evaluated as vague linguistic value by subjective decision making. Fuzzy techniques is a proper method to quantify vague conditions and divided into three parts which consist of fuzzy theory, fuzzy inference and fuzzy measures. Therefore, this study utilize fuzzy method to analyze risk factors. the weight of risks is estimated by reflecting the interrelationship among risks factors from absolute weights obtained by fuzzy measure into the relative weights by analytical hierarchy process(AHP). The interrelationship is estimated by Sugeno λ-Fuzzy measure. Finally this study should understand effects of risk factors of the whole risk and promote efficient operation of project's risk management through this method in BTL projects.
- URI
- http://www.dbpia.co.kr/Journal/ArticleDetail/NODE00955644https://repository.hanyang.ac.kr/handle/20.500.11754/104307
- ISSN
- 1226-9107
- Appears in Collections:
- RESEARCH INSTITUTE[E](부설연구소) > RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY(공학기술연구소) > Articles
- Files in This Item:
There are no files associated with this item.
- Export
- RIS (EndNote)
- XLS (Excel)
- XML