2021-05 | Geotechnical Property Modeling and Construction Safety Zoning Based on GIS and BIM Integration | 서종원 |
2013-02 | GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis | 서종원 |
2022-01 | Implementation experiments on convolutional neural network training using synthetic images for 3D pose estimation of an excavator on real images | 서종원 |
2017-12 | Improving dynamic proximity sensing and processing for smart work-zone safety | 서종원 |
2011-05 | Improving safety in carriage-based formwork of concrete bridge decks | 서종원 |
2022-07 | An Integrated HBIM Framework for the Management of Heritage Buildings | 서종원 |
2021-04 | The Integration of Earthwork Design Review and Planning Using UAV-Based Point Cloud and BIM | 서종원 |
2015-06 | Integration of Smart Glass Technology for Information Exchange at Construction Sites | 서종원 |
2012-01 | Intelligent navigation strategies for an automated earthwork system | 서종원 |
2018-03 | Interaction analysis for vision-based activity identification of earthmoving excavators and dump trucks | 서종원 |
2014-11 | LCCA기반 터널 자산관리 시스템 개발을 위한 연구개발 프레임웍 설계 | 서종원 |
2017-09 | Long-term trend analysis of CO in the Yongsan district of Seoul, Korea, between the years 1987 and 2013 | 서종원 |
2015-06 | Machine Guidance Based Site Control Technology (SCT) for Earthwork Equipment Fleet | 서종원 |
2021-10 | Methodology for Voxel-Based Earthwork Modeling | 서종원 |
2016-11 | Methodology of Earthwork BIM Modeling & Un-excavated Volume Calculation of Road Project | 서종원 |
2018-06 | Modular data communication methods for a robotic excavator | 서종원 |
2016-05 | Optical marker-based end effector pose estimation for articulated excavators | 서종원 |
2018-03 | Optimal cut-fill pairing and sequencing method in earthwork operation | 서종원 |
2017-02 | PROTOTYPING A REMOTELY-CONTROLLED MACHINE FOR CONCRETE SURFACE GRINDING OPERATIONS | 서종원 |
2021-02 | Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions | 서종원 |
2013-06 | Risk Based Decision Support for Final Closing Section of a Sea Dike | 서종원 |
2016-11 | Simulation-Based Assessment of Workers' Muscle Fatigue and Its Impact on Construction Operations | 서종원 |
2014-12 | Spatial factors affecting the loading efficiency of excavators | 서종원 |
2015-06 | A Study on Generation of 3D Model and Mesh Image of Excavation Work using UAV | 서종원 |
2017-01 | Study on the slip resistance of embo-spray coating of urethane-based floor material | 서종원 |
2011-04 | Task planner design for an automated excavation system | 서종원 |
2011-06 | Task Planner for autonomous excavator considering work environment | 서종원 |
2020-04 | Task planning strategy and path similarity analysis for an autonomous excavator | 서종원 |
2018-02 | Utilization analysis methodology for fleet telematics of heavy earthwork equipment | 서종원 |
2018-12 | Value Rating Model for Intangible Assets in Civil Engineering Consulting Firms in Korea | 서종원 |