Browsing byAuthor서종원

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 22 to 51 of 93

Issue DateTitleAuthor(s)
2019-11Damage Prevention for underground utilities using machine guidance서종원
2013-01Design Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Project서종원
2013-01Design Structure Matrix를 활용한 플랜트 설계의 최적 협업 체계에 관한 연구서종원
2022-07Development and Assessment of an Intelligent Compaction System for Compaction Quality Monitoring, Assurance, and Management서종원
2018-01Development of a trip time for bit exchange simulator for drilling time estimation서종원
2016-10Earth Work Bim for Machine Guidance서종원
2018-02Eco-economic excavator configuration method서종원
2013-09Estimation of instantaneous and daily net radiation from MODIS data under clear sky conditions: a case study in East Asia서종원
2020-10Estimation of the volume of a rock layer using kriging method for energy efficient excavation서종원
2020-01Flexible 3D Model Partitioning System for nD-Based BIM Implementation of Alignment-Based Civil Infrastructure서종원
2021-05Geotechnical Property Modeling and Construction Safety Zoning Based on GIS and BIM Integration서종원
2013-02GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis서종원
2022-01Implementation experiments on convolutional neural network training using synthetic images for 3D pose estimation of an excavator on real images서종원
2017-12Improving dynamic proximity sensing and processing for smart work-zone safety서종원
2011-05Improving safety in carriage-based formwork of concrete bridge decks서종원
2022-07An Integrated HBIM Framework for the Management of Heritage Buildings서종원
2021-04The Integration of Earthwork Design Review and Planning Using UAV-Based Point Cloud and BIM서종원
2015-06Integration of Smart Glass Technology for Information Exchange at Construction Sites서종원
2012-01Intelligent navigation strategies for an automated earthwork system서종원
2018-03Interaction analysis for vision-based activity identification of earthmoving excavators and dump trucks서종원
2014-11LCCA기반 터널 자산관리 시스템 개발을 위한 연구개발 프레임웍 설계서종원
2017-09Long-term trend analysis of CO in the Yongsan district of Seoul, Korea, between the years 1987 and 2013서종원
2015-06Machine Guidance Based Site Control Technology (SCT) for Earthwork Equipment Fleet서종원
2021-10Methodology for Voxel-Based Earthwork Modeling서종원
2016-11Methodology of Earthwork BIM Modeling & Un-excavated Volume Calculation of Road Project서종원
2018-06Modular data communication methods for a robotic excavator서종원
2016-05Optical marker-based end effector pose estimation for articulated excavators서종원
2018-03Optimal cut-fill pairing and sequencing method in earthwork operation서종원
2017-02PROTOTYPING A REMOTELY-CONTROLLED MACHINE FOR CONCRETE SURFACE GRINDING OPERATIONS서종원
2021-02Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions서종원

BROWSE